The challenge

KTM's production planning in India depends on a network of vendors supplying components to its assembly lines.

Vendors received production plans as periodic messages from the planning team. The plan changed between messages, and any change that reached a vendor late caused a component shortage on the line or stock the vendor held without need.

The planning team absorbed the cost as coordination work. Checking what each vendor believed, and correcting it, took time the team should have spent on planning.

Our approach

We gave vendors direct access to the plan itself. The planning system already held the current plan, while vendors read copies that aged from the moment they were sent.

A vendor platform shows current production plans, material requirements and schedule changes as they happen. It is integrated with KTM's SAP environment, so vendors see the plan of record. Each vendor sees only its own data, since volumes are commercially sensitive within a supplier network.

What we built

The vendor platform we built shows live production plans, material requirements and schedule changes, fully integrated with the manufacturer's SAP environment, with access scoped to each vendor. It is built on React, Node.js and MySQL.

Head of Production PlanningKTM
“Vendors were planning against a schedule that reached them by email, days after it had already changed.”

Outcome

  • Vendors read the current plan directly from the system of record.

  • The platform shows the plan of record as it stands.

  • Planning staff spend their time on planning.

Team

Engagement Senior Partner
Hannan Hakim
Chief Technology Officer
Swapnil H
Chief of Operations
Arjun Patni
Principal Software Engineer
Dhanashree
Senior Project Management & Operations
Chinmay C
Engagement Director
Rima

Our learnings

  1. 01

    Remove the copy. Vendors were reading a document that started to age the moment it was sent.

  2. 02

    Integration with the plan of record was the core of the work. A synchronised copy would bring the problem back.

  3. 03

    Scope access by vendor. Volumes are commercially sensitive between suppliers.

  4. 04

    The time saved landed in the planning team, where the coordination cost had been sitting.